The Ohio River corridor from Portsmouth through Huntington to Parkersburg is underserved by multi-process finishers. It also produces the kind of heavy, stored and weathered steel that needs one.
This corridor runs to chemical processing, energy and oilfield equipment, power generation and heavy fabrication. The work is large, often welded rather than machined, and a good deal of it sits outdoors or in unheated storage between fabrication and service. Stainless in chemical service brings its own requirement, because free iron left on the surface is where the corrosion starts.
The drive from Este Avenue
US-52 and OH-32 down the Ohio River, then I-64 east into West Virginia.
| From the plant to | Distance | Drive |
|---|---|---|
| Portsmouth | about 105 mi | about 1 hr 50 |
| Ironton | about 140 mi | about 2 hr 20 |
| Athens | about 150 mi | about 2 hr 30 |
| Huntington | about 150 mi | about 2 hr 30 |
| Marietta and Parkersburg | about 190 mi | about 3 hr |
| Charleston | about 200 mi | about 3 hr 15 |
Distances are approximate road mileage from 6350 Este Ave, Cincinnati, and drive times assume ordinary traffic.
What this market usually needs
A different industry mix asks for a different process mix. These are the three that come up most often here, out of the six on site.
Shot Blasting
Surface preparation on weldments and heavy fabrications, including work hung at up to 2,000 lb per hook.
Learn morePassivation
Free iron removal on stainless bound for chemical service, to the practice the specification calls for.
Learn moreParts Washing
Removing shop oils and contaminants before coating, so the surface the next operation meets is the one it expects.
Learn moreAll six processes run on one site, so a part needing several of them is quoted and scheduled as a single job. See every service.
Freight, and whether the trip is worth it
Most of this corridor sits between two and three hours out, and the competing option is often not a nearer finisher at all. Multi-process finishing is thin on the ground here, which means work that needs blasting and passivating and plating is frequently split across distance anyway. Consolidating it into one routing is usually the shorter total journey, even when the single leg is longer.
Transit. Between roughly two and three and a quarter hours, depending where on the river you sit. Lead time itself depends on the process and the lot size, so MFI quotes it per job rather than publishing one figure. Rush and hot orders are accommodated.
Questions from this market
Often not. Surface rust can frequently be addressed by chemical or mechanical rust removal, and which is appropriate depends on the material, the geometry, how far the corrosion has gone and what has to happen to the part next. Send a photograph and MFI will tell you whether the lot is recoverable before you write it off.
Blasting handles bulk small geometry on tumble equipment through to heavy work hung at up to 2,000 lb per hook. Send the largest part in the family and MFI will confirm it against the equipment.
Yes, to the practice the specification calls for, under an ISO 9001:2015 quality system. Send the specification with the part and the documentation is quoted alongside the work.
Other markets we serve
Cincinnati and the Tri-State
Every location listed above is inside roughly a one hour drive of the plant.
ViewDayton and Columbus
Roughly one hour to Dayton and under two hours to Columbus, each way.
ViewIndianapolis and Fort Wayne
About two hours to Indianapolis and about three to Fort Wayne, each way.
ViewLouisville and Lexington
Under an hour and a half to Lexington and under two hours to Louisville, each way.
ViewToledo and southern Michigan
About three hours to Toledo and closer to four into southern Michigan, each way.
ViewRequest a quote on your part
Send the material, the volume and the finish specification. MFI will confirm the process, the lead time and the price.